First Falcon 7X Arrives In Little Rock For Completion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Dec 18, 2006

First Falcon 7X Arrives In Little Rock For Completion

Certification Expected In Early '07

Dassault Falcon’s Little Rock, AR completion center recently accepted the first Falcon 7X (s/n 05) for completion. The world’s first purpose built fly-by-wire business jet arrived from Bordeaux-Merignac with a "green" Falcon 2000EX EASy escort, that also arrived for completion, on Tuesday, December 12. Both were greeted by the 1800 engineers, craftsman and designers that comprise Dassault’s largest facility worldwide.

"Little Rock has been preparing for this moment since the Falcon 7X program was announced in 2001," said John Rosanvallon, President and CEO of Dassault Falcon. "We’ve increased employment, enlarged our production facility and are evaluating further increases to accommodate the unprecedented demand for all Falcon aircraft but particularly the Falcon 7X."

During 2007 Dassault expects to deliver a significant number of the 5950 nm 7X tri-jet. All 7X aircraft will be completed at the Little Rock facility.

The facility has dedicated four hangars (99,000 square feet) solely for 7X completions. In addition, Dassault expects to increase employment at the facility by slightly more than 200 over the coming years to accommodate the demand. It is already the world’s largest Dassault facility with nearly 1800 employees and 700,000 square feet of work area.

Largely due to the utilization of the PLM (Product Lifecycle Management) processes, the time required to complete the 7X will eventually be lower than other Falcons. Cabinet, paint and manufacturing shops have already begun production. Cabinets and upholstery, for example, are now being manufactured in much less time due to new automated systems.

The Falcon 7X flight test and certification program is now nearing 1300 flight hours and 450 flights. The four aircraft used in the program are now flown daily with many performing multiple flights every day. Certification flights are expected to be completed by the end of this year. Falcon 7X s/n 05 is expected to be the first aircraft to enter service when it’s delivered to a European based customer during the second quarter of 2007 following certification by the EASA and FAA expected in early 2007.

Dassault says its Falcon 7X program is the most successful launch of a large cabin business jet ever with over 125 aircraft on order. Forty aircraft are now in various stages of production, with s/n 19 in final assembly at Charles Lindbergh Hall in Bordeaux-Merignac.

Announced last year, production of the Falcon 7X will increase to three per month in late 2007. To accommodate demand, future production increases are currently being evaluated. The next delivery position available is in 2011.

Dassault Falcon Jet Corp. is a wholly owned subsidiary of Dassault Aviation, and is responsible for selling and supporting Falcon business jets throughout North America, South America, and the Pacific Rim countries of Asia, including China.

FMI: www.dassaultfalcon.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC