AD: Bombardier, Inc. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Aug 20, 2014

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-16-07

PRODUCT: Certain Bombardier, Inc. Model DHC-8-400, -401, and -402 airplanes.
ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2011-15-09 for the products listed above. AD 2011-15-09 required repetitive inspections for proper operation of the main landing gear (MLG) alternate extension system (AES), and corrective actions if necessary.

This new AD requires, for certain airplanes, new repetitive inspections for proper operation of the MLG AES, and corrective actions if necessary. This new AD also requires eventually replacing the MLG AES cam mechanism assembly with a new assembly, which terminates the repetitive inspections for those airplanes.

This AD was prompted by a determination that, for certain airplanes not affected by AD 2011-15-09, a different MLG AES cam mechanism assembly was installed, resulting in input lever fractures and inability to open the MLG door; those assemblies could be subject to the same unsafe condition in AD 2011-15-09.

The FAA is issuing this AD to prevent improper operation of the cam mechanism or rupture of the door release cable, which could result in loss of control of the airplane during landing.

DATES: This AD becomes effective September 23, 2014.

FMI: AD

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC