HAI: Urgent Input Needed on NTSB Proposal From Rotor Community | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-AffordableFlyers-09.12.24

Airborne-Unlimited-09.13.24

Fri, Feb 25, 2005

HAI: Urgent Input Needed on NTSB Proposal From Rotor Community

HAI Wants YOUR Input On Problematic NPRM

The NTSB has issued an NPRM to amend Federal regulations governing notification and reporting of aircraft accidents, incidents, overdue aircraft, and additional requirements governing the preservation of aircraft wreckage.

HAI President Roy Resavage encourages all HAI members to carefully review the proposed rule which would remove reference to ground damage to helicopter main and tail rotor blades from the list of exclusions. The NTSB has called for the revision, stating “the main rotor blades of a helicopter are the lifting surfaces of the aircraft and are considered to be equivalent to the wings of an airplane.” Further, the “tail rotor blades of a helicopter provide yaw control and are analogous to the rudder control surface of an airplane.” Thus, the NTSB proposes to bring any event involving ground damage to main or tail rotor blades within the definition “Substantial Damage.” This would clearly make them “Reportable Events” that would require that the event be reported as an accident instead of an incident.

This issue has been addressed in meetings with members of the NTSB and was a topic of discussion during many of the HAI standing committee meetings at HELI-EXPO 2005. The Helicopter Association International will also submit comments on behalf of our members and we are asking for your input to assist in preparing our submittal. HAI requested that the comment period be extended and we have just received word from the NTSB that a two week extension has been granted. The new deadline for submittal of comments to the NTSB is now on or before March 11, 2005.

Considering the importance of this issue and fully recognizing the shortness of time for preparing submittals, HAI requests that you have your comment back to HAI by close of business Monday March 7, 2005. Again we encourage you to submit your comments to HAI, as well as directly to the NTSB.

You may access and review the full NPRM, along with an “Information Sheet” authored by Mr. Roy G. Fox, Chief, Flight Safety, Bell Helicopter Textron by going to www.rotor.com/NTSBNPRM.pdf and www.rotor.com/NTSBNPRMinfo.pdf. Mr. Fox has stated that you are welcome to use, as you see fit, the information and comments he has provided, in preparing your own comments for submittal to the NTSB.

Additional information on this proposed rule is available from Deepak Joshi, Lead Aerospace Engineer for the NTSB at 202-314-6348. Written comments should be submitted to Mr. Joshi at the NTSB, Room 5235, 490 L’Enfant Plaza, SW, Washington, D.C. 20594. HAI members may also contact HAI Director of Heliports & Technical Programs, Harold Summers at 703-683-4646 or by e-mail at harold.summers@rotor.com.

FMI: www.rotor.com, www.ntsb.gov

Advertisement

More News

ANN's Daily Aero-Term (09.16.24): Receiver Autonomous Integrity Monitoring

Receiver Autonomous Integrity Monitoring (RAIM) A technique whereby a civil GNSS receiver/processor determines the integrity of the GNSS navigation signals without reference to sen>[...]

ANN's Daily Aero-Linx (09.16.24)

Aero Linx: The Flying Dentists Association The Flying Dentists Association is a professional and social association devoted to continuing dental education combined with aviation an>[...]

NTSB Prelim: Piper PA-28-140

Clouds Were At About 100 Ft Above The Ground When (Witness) Initially Heard The Airplane Fly By On August 26, 2024, about 0931 central daylight time, a Piper PA28-140, N9626K, was >[...]

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC