NORAD Exercises Planned For Washington, D.C. | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jan 11, 2011

NORAD Exercises Planned For Washington, D.C.

Overflights Planned To Begin Midnight Tuesday

The North American Aerospace Defense Command and its geographical component, the Continental United States NORAD Region (CONR), will conduct a three-day exercise -- Falcon Virgo 11-04 -- beginning about midnight Tuesday in the National Capital Region, Washington, D.C.

The exercise is comprised of a series of training flights held in coordination with the Federal Aviation Administration, the National Capital Region Coordination Center, the Joint Air Defense Operations Center, Civil Air Patrol, U.S. Coast Guard and CONR’s Eastern and Western Air Defense Sectors. Tuesday’s and Wednesday’s flights are scheduled to take place between 2330 and 0530 EST. Thursday’s flights are scheduled to take place between 2330 and 0130 EST.

Exercise Falcon Virgo is designed to hone NORAD’s intercept and identification operations as well as operationally test the NCR Visual Warning System. Civil Air Patrol aircraft, Air Force F-16’s and a Coast Guard HH-65 Dolphin helicopter will participate in the exercise. These exercises are carefully planned and closely controlled to ensure CONR’s rapid response capability. NORAD has conducted exercise flights of this nature throughout the U.S. and Canada since the start of Operation Noble Eagle, the command’s response to the terrorist attacks on Sept. 11, 2001.

In the event of inclement weather, the exercise will take place the next day, until all training requirements are met. If bad weather continues, officials will then make a decision to postpone or cancel the exercise.

FMI: www.norad.mil


Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC