AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Aug 21, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-10

PRODUCT: Certain Airbus Model A300 B4-600R series airplanes, Model A300 C4-605R Variant F airplanes, and Model A300 F4-600R series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-15-17, which applied to the airplanes listed above.

AD 2017-15-17 required an inspection of the lower area of a certain frame (FR) radius for cracking, and corrective action if necessary. This AD requires new repetitive inspections of the forward fitting lower radius of a certain frame for cracking, and corrective actions if necessary.

This AD was prompted by a determination that repetitive inspections and applicable corrective actions are necessary.

DATES: This AD is effective September 24, 2018.

COST: The FAA estimates that  this AD affects 94 airplanes of U.S. registry.

  • The actions required by AD 2017-15-17, and retained in this AD, take about 4 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2017-15-17 is $340 per product.
  • The FAA also estimates that it takes about 4 work-hours per product to comply with the new requirements of this AD, including 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of this AD on U.S. operators to be $425 per product.
  • The agency has received no definitive data that enables it to provide cost estimates for the on-condition actions specified in this AD.
FMI: AD

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC