GPS Testing Scheduled For The Central U.S. | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Apr 05, 2018

GPS Testing Scheduled For The Central U.S.

Signals May Be Unreliable April 7-15

GPS testing is scheduled for much of the central U.S. next week, which may result in unreliable or unavailable GPS signals.

According to an FAA NOTAM delivered to the media, the testing will be centered on the 013 degree radial of the VULCAN VORTAC near Birmingham, AL at 61 nautical miles April 07 – 15 between 0600Z – 1000Z.

NAV GPS (AFSMO GPS 18-22) (including WAAS, GBAS, and ADS-B) may not be available during the period within a 239 nautical mile radius of the center as follows:

  • 239 nautical mile (nm) radius from FL400-UNL
  • 191 nm radius at FL250
  • 121 nm radius at 1,000 feet
  • 82 nm radius at 400 feet AGL
  • 35 nm radius at 50 ft AGL

Pilots are encouraged to report anomalies only when ATC assistance is required.

The NOTAMs discussed in this advisory may change with little or no notice. Pilots are advised to check NOTAMs frequently for possible changes prior to operations in the area. NOTAMs will be published at least 24 hours in advance of any GPS tests.

(Image provided with NOTAM)

FMI: www.faasafety.gov/files/notices/2018/Apr/AFSMO_18-22_GPS_Flight_Advisory.pdf

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC