Fourth Airbus Military A400M Makes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 25, 2010

Fourth Airbus Military A400M Makes First Flight

Grizzly Fleet Ends 2010 With 1,000 Hours In The Air

The fourth Airbus Military A400M military airlifter has made its first flight - the culmination of a highly successful 2010 which also saw the fleet of Grizzly development aircraft complete just over 1,000 hours flight-time and 300 flights. Known as Grizzly 4, the aircraft took off from Seville, Spain with a weight of 130 tonnes at 1018 local time (GMT+1), landing five hours and ten minutes later.


File Photo

Experimental Test Pilot Klaus-Dietrich Flade captained the flight, supported by Experimental Test Pilot Christophe Cail. The crew also included Test Flight Engineers Jose Aragon-Gomez and, Bruno Bigand, and Flight Test Engineers Jose Casado-Corpas, and Catherine Schneider. Catherine is the first female Flight Test Engineer and test crew member to participate in an A400M first flight.

Grizzly 4 is the fourth of an eventual five aircraft which will conduct the 3,700 hour flight-test programme leading to first delivery in around two years time. It will be primarily dedicated to cargo and air-to-air refuelling operations and carries a medium flight-test instrumentation load.

Airbus Head of Flight Operations Fernando Alonso said: "The on-time first flight of Grizzly 4 highlights what has been an excellent first year of the flight-test programme. We end 2010 fully on schedule and with every expectation of rapidly building flight-hours and hitting our key test objectives in the year ahead. I am particularly proud of the seamless work done by the Airbus and Airbus Military teams in the Seville and Toulouse Flight Test Centres which has been instrumental in this achievement."


File Photo

The maiden flight of Grizzly 4 followed the completion of a series of milestones in recent months - notably the first paratrooper jumps from the aircraft, which were highly successful and demonstrated the excellent potential of the aircraft for this military operation. Flights with the ramp and doors open have proceeded smoothly.

An extensive programme of flying the aircraft with simulated icing shapes attached to the wings and tail has been completed. These flights were performed by Airbus and European Aviation Safety Agency (EASA) flight crews and represent the first set of certification tests completed on the A400M. Preliminary tests of protective kits for rough-field operations have been completed in preparation for next year's trials.

Flight and ground load testing is complete, as is measurement of cruise performance. All major aircraft systems have been tested and flutter tests throughout the flight envelope are extremely close to completion. The Europrop International (EPI) TP400 engines have been performing well, with the in-flight relight capability having been successfully demonstrated and ground starts following an overnight cold-soak recently performed. Behavior of the auxiliary power unit has been excellent, and it has been started as high as 40,000ft.


File Photo

Following the A400M's maiden flight on 11the December 2009, earlier this year Grizzly 2 and Grizzly 3 made their first flights in respectively April and July and their introduction into the fleet made possible the outstanding demonstrations of the A400M's handling qualities at the Berlin and Farnborough airshows.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC