AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Aug 08, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-07-04

PRODUCT: All Boeing Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes, Model MD-88 airplanes, and Model MD-90-30 airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a report of loss of airspeed indication due to icing.

This AD requires modifying the air data heat (ADH) system.

DATES: This AD is effective September 10, 2018.

COST: The FAA estimates that this AD affects 553 airplanes of U.S. registry. The costs of compliance are estimated as follows:

  • Modification, MD-80 Group 1, 84 airplanes. Labor 56 work-hours × $85 per hour = $4,760. Parts $4,459. Total cost per aircraft $9,219.
  • Modification, MD-80 Group 2, 11 airplanes. Labor 57 work-hours × $85 per hour = $4,845. Parts $11,014. Total cost per aircraft $15,859.
  • Modification, MD-80 Group 3, 336 airplanes. Labor 57 work-hours × $85 per hour = $4,845. Parts $8,589 Total cost per aircraft $13,434.
  • Modification, MD-80 Group 4, 1 airplane. Labor 56 work-hours × $85 per hour = $4,760. Parts $4,479. Total cost per aircraft $9,239
  • Modification, MD-80 Group 5, 37 airplanes. Labor 57 work-hours × $85 per hour = $4,845. Parts $11,034 Total cost per aircraft $15,879.
  • Modification, MD-90 Group 1, 84 airplanes. Labor 37 work-hours × $85 per hour = $3,145. Parts $4,395.  Total cost per aircraft $7,540.
FMI: AD

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC