Boeing Nears Completion On 737-900ER Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Jan 27, 2006

Boeing Nears Completion On 737-900ER Design

First Customer Delivery Expected In Early 2007

Boeing representatives tell Aero-News that company engineers have completed 90 percent of the design work on the newest variant of the stalwart 737, the 737-900ER.

The milestone means that nearly all of the engineering work necessary to build parts and tools for assembly has been completed and released to manufacturing.

"This is a critical milestone for the airplane as we make the transition from the development phase to the production phase," said Mike Delaney, 737 chief project engineer. "With most of the drawings complete, our suppliers and fabrication plants can begin manufacturing detailed parts."

What's more, the design milestone was reached spot-on the target date, meaning Boeing is on schedule to begin final assembly of the first 737-900ER this spring at the company's Renton, WA manufacturing facility.

As Aero-News reported last year, the -900ER was launched in July 2005 with a 30-airplane order from Indonesian carrier Lion Air. The Next Generation 737-900ER is designed to carry up to 215 passengers and fly up to 3,200 nautical miles (5,925 km).

Lion Air is expected to receive the first 737-900ER in the first half of 2007, after a five-month flight test program conducted using two test airplanes.

Ramp spotters will be able to identify the -900ER most readily by its additional pair of exit doors, as well as a two-position tail skid and blended winglets. A flat rear pressure bulkhead, aerodynamic and structural design changes that enhance low-speed and cruise performance, enhancements to the leading and trailing-edge flap systems, and strengthened wings are also part of the package.

All -900ERs will be powered by the CFM International CFM56-7B turbofan engines.

Boeing stressed the new derivative will have substantial economic advantages over the competing A321 -- including 9 percent lower operating costs per trip and 7 percent lower operating costs per seat.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (05.25.25)

“Each Honor Flight mission is a special occasion, but the ability to be a part of EAA AirVenture always creates unforgettable moments. Honoring our local Vietnam veterans out>[...]

Classic Aero-TV: Efficient Versatility -- NASA GL-10 Greased Lightning

From 2015 (YouTube Edition): The Airframes Displayed At AUVSI 2015 Were Quite Innovative It’s common to visualize a small vertical lift UAV as having 4 to 6 propellers, it&rs>[...]

NTSB Prelim: Cessna 525

The Airplane Began A Descent While Still In A Right Turn And Impacted Terrain On March 13, 2025, about 0733 central daylight time, a Cessna 525A airplane, N525CZ, was destroyed whe>[...]

Klyde Morris (05.23.25)

It Looks Like It's Gonna Get A Bit Tight, Klyde FMI: www.klydemorris.com>[...]

Airborne-NextGen 05.20.25: Drone Regs, Zero-Emission Cargo, Door-Dash Drone

Also: Blackhawk’s Replacement, Supersonic Flight, Archer 1Q/25, Long-Range VTOL Program U.S. Secretary of Transportation Sean P. Duffy released an update on progress being ma>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC