First Engine Runs Performed On A400M | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 22, 2009

First Engine Runs Performed On A400M

Ground-Idle And Flight-Idle Power Tested, Takeoff Power Soon

Airbus Military achieved a key milestone in the A400M military airlifter program, when all four Europrop International (EPI) TP400 turboprops on the aircraft were run simultaneously for the first time on Wednesday.

The event was the culmination of a series of tests in the previous 72 hours in which the engines and propellers were first turned using ground power with no fuel in the fuel-lines, in a process known as dry-cranking. Then they were turned with fuel in the lines but without starting the engines, known as wet-cranking.

All four of the engines on aircraft msn 01 were successfully run for four hours beginning in the early evening during an operation that lasted for 6.5 hours including preparation. The engines ran at low power settings in ground-idle and flight-idle modes and will be run up to maximum take-off power in further runs planned to take place shortly.

The operation at Airbus Military's Seville, Spain facility was part of the procedure known as destorage of the engines following the handover to the flight-test team at the end of the previous week.

After the first full run, during which the engines performed flawlessly, the engine cowls were opened and inspections showed that there had been no hot-air or fluid leaks. On the subsequent runs the test team will continue exploring the behavior of the engine itself and also that of the aircraft systems that are powered by the engine. Additionally the auxiliary power unit (APU), a separate small engine mounted on the aircraft itself and designed to provide electrical power to the aircraft systems, was tested. It was used to start the engines for the main engine run.

Airbus CEO Tom Enders, who personally witnessed the first full engine run-up, said: "I wish to thank and congratulate the teams who worked extremely hard to reach this very important milestone which paves the way to the A400M First Flight in the weeks to come."

Fernando Alonso, Head of Flight Operations, added: "This is the first time we completely powered up the aircraft using the engine power and the first time that the aircraft has been operated completely autonomously."

FMI: www.airbus.com

Advertisement

More News

Aero-News: Quote of the Day (11.26.25)

“We are disappointed with today’s verdict and respectfully disagree with the outcome. From the outset, we have maintained that Gogo’s independently developed 5G t>[...]

ANN's Daily Aero-Term (11.26.25): Takeoff Hold Lights (THL)

Takeoff Hold Lights (THL) The THL system is composed of in-pavement lighting in a double, longitudinal row of lights aligned either side of the runway centerline. The lights are fo>[...]

ANN's Daily Aero-Linx (11.26.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

Airborne Affordable Flyers 11.20.25: Sonex $$$, SnF 26 MOSAIC DAY, P. Ponk STCs

Also: Elfin 20 Journey, BASE Jumper Rescue, Pipistrel Makes Waves, EAA Hall of Fame, Affordable Flying Expo 2026 Like most of the industry, kit manufacturer Sonex has been hit by t>[...]

ANN's Daily Aero-Linx (11.27.25)

Aero Linx: The de Havilland Moth Club Ltd The de Havilland Moth Club evolved from a belief that an association of owners and operators of Moth aeroplanes should be formed to create>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC