FAA Delays Start Date For New Repair Station Rule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Sep 30, 2003

FAA Delays Start Date For New Repair Station Rule

The FAA this week pushed back for the second time the effective date of changes to repair station regulations. AOPA and other aviation associations wrote letters in support of the delay, because rushing the rule would have ultimately increased costs for aircraft owners.

Under the rule, repair stations have to develop new manuals. To do so before the FAA issues guidelines and trains its own inspectors would inevitably lead to costly revisions of the manuals — costs that would be passed on to the aircraft owner in the form of higher repair costs.

"It would be counterproductive and an inefficient use of resources to implement the rule before publishing the guidance materials and before FAA employee training is completed," AOPA said in the letter "It will only serve to add to the affected repair station's costs of doing business without any safety benefit. Those added costs would also be passed on to consumers, in the cost of doing business."

Initially, the final rule was to become effective April 6, 2003, but was subsequently extended to October 3, 2003, and now to January 31, 2004. The extension to the final rule effective date will help ensure a smooth transition to the new part 145 without an undue economic burden to repair stations and ultimately the aircraft owners.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC