Next Artemis Launch Attempt To Face Significant Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Sep 05, 2022

Next Artemis Launch Attempt To Face Significant Delay

Be Prepared For A Roll-Back

By Wes Oleszewski, ANN Space Correspondent

While everyone in the media is talking about the LH2 (Liquid Hydrogen) leak in the Space Launch System’s quick release connector, one small detail is somewhat overlooked.

When the current lunar launch window closes on Tuesday September 6, 2022, the certification date for the batteries in the vehicle command destruct system also expires. There is no way to re-certify the system at Launch Complex 39B because there is no access arm to that area of the booster. The only way to re-certify the system is by way of the access platforms in the VAB.

Thus, conjecture as to if or not the engineers need to construct some sort of weather shelter in order to service that leaky quick-disconnect in order to repair the LH2 leak at the launch pad is moot unless they can get it all done and launch before the command destruct system expires.

Although the VAB provides plenty of shelter from Florida’s weather, the downside to a roll-back and repair indoors is that once the repair is finished there is no way to completely test the fix. The only way to test that fitting is to roll the vehicle all the way back out to Pad 39B where the LH2 can be fed into the system.

Additionally, although it has been discovered that the August 29 scrub caused by readings that one of the core stage’s RS25 engines was not being properly chilled was caused by a faulty sensor- it is important to point out that the KSC weather rules went red 16 minutes before the launch window opened. The weather continued in the red through most of the launch window. So, faulty sensor or not, the launch was scrubbed for weather before it ever got started.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC