Glitch Forces SpaceX To Bump DemoFlight 2 Launch Until February At Earliest | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jan 20, 2007

Glitch Forces SpaceX To Bump DemoFlight 2 Launch Until February At Earliest

Musk Advises "Don't Hold Your Breath" For A Firm Date

While discouraged by the failure of the company's first-ever launch of the Falcon 1 rocket last March, SpaceX vowed to press on... and the company is nearing its second launch from the balmy Kwajalein Atoll.

Alas, the original January 22 scheduled launch date has been moved off to sometime in February, due to an anomaly with a second stage engine component.

Company founder Elon Musk tells ANN a static firing of the rocket's main engine will take place between today and Tuesday, after which time the rocket will be rolled back into the hangar for more testing...

During our final check-outs prior to static fire, we uncovered an anomaly with the thrust vector control (TVC) pitch actuator on the second stage that will result in launch being pushed to February. Since this is not used during the static fire, we have decided to push forward with that test in order to acquire valuable data on engine ignition, pad acoustics, and the overall system response.

The static fire is now planned to occur between Saturday and Tuesday (California time). This test will proceed very slowly and then only burns for about four seconds, so will not be webcast to avoid boring people silly. We will post a video afterwards.

Upon completion of the static fire, we will take the rocket back into the hangar to thoroughly investigate the TVC issue. With the range available to us only until January 23 (Kwaj needs to reconfigure for an incoming Minuteman mission), this means launch is now planned for mid-February.

As I’ve mentioned previously, don’t hold your breath for this launch. Given the large number of robustness improvements and the fact that our vehicle/pad health verification system has increased from about 30 checks to almost 1000, shifts in the launch date are to be expected.

Overall, the SpaceX team is quite happy with the smooth progress so far.

---Elon

FMI: www.spacex.com

Advertisement

More News

NTSB Prelim: Cirrus Design Corp SR20

The Airplane Made An Uncommanded Right Yaw And Roll, And He Was Unable To Maintain Control Of The Airplane On November 11, 2025, about 1750 central standard time, a Cirrus SR20, N8>[...]

ANN's Daily Aero-Linx (11.30.25)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (11.30.25): Wind Shear Escape

Wind Shear Escape An unplanned abortive maneuver initiated by the pilot in command (PIC) as a result of onboard cockpit systems. Wind shear escapes are characterized by maximum thr>[...]

Aero-News: Quote of the Day (11.30.25)

“Working closely with the Polish Armed Forces, we’re focused on disciplined execution to help enhance Poland’s defense capabilities and keep up with the strong de>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC