Rapid Response Space Works Contract Awarded By NASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jul 18, 2010

Rapid Response Space Works Contract Awarded By NASA

Company Selected Will Provide "Rapid Access To Space" For DoD

Serving as a contracting agent for the Department of Defense's Operationally Responsive Space (ORS) Office, NASA has selected Millennium Engineering and Integration Co., of Arlington, VA, to receive a contract for Rapid Response Space Works (RRSW).

Under the terms of the contract, the company will provide support for the ORS Office within the Department of Defense. In partnership with the DOD, NASA will play a role in planning, acquisition and operations of ORS efforts. Specifically, the company will design, develop, build, operate and sustain the RRSW to enable rapid access to space for DOD. The RRSW activities include mission coordination, design, development, procurement, assembly, integration, test, on-orbit support, launch support and ground system support.

NASA released a Request for Proposals to industry on Feb. 1, 2010, to solicit two individual requirements, including this RRSW contract and a Modular Space Vehicles (MSV) contract, which will be awarded at a later date. The RRSW and MSV contracts share a maximum value of $500 million.

The work will be performed at Kirtland Air Force Base, Albuquerque, NM. The contract with Millennium Engineering and Integration Co. includes a subcontract with Raytheon Co., of Tuscon, AZ. The agreement is for an indefinite-delivery, indefinite-quantity, cost-plus fixed-fee single award contract that began Wednesday and consists of a five-year period of performance.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC