Rapid Response Space Works Contract Awarded By NASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jul 18, 2010

Rapid Response Space Works Contract Awarded By NASA

Company Selected Will Provide "Rapid Access To Space" For DoD

Serving as a contracting agent for the Department of Defense's Operationally Responsive Space (ORS) Office, NASA has selected Millennium Engineering and Integration Co., of Arlington, VA, to receive a contract for Rapid Response Space Works (RRSW).

Under the terms of the contract, the company will provide support for the ORS Office within the Department of Defense. In partnership with the DOD, NASA will play a role in planning, acquisition and operations of ORS efforts. Specifically, the company will design, develop, build, operate and sustain the RRSW to enable rapid access to space for DOD. The RRSW activities include mission coordination, design, development, procurement, assembly, integration, test, on-orbit support, launch support and ground system support.

NASA released a Request for Proposals to industry on Feb. 1, 2010, to solicit two individual requirements, including this RRSW contract and a Modular Space Vehicles (MSV) contract, which will be awarded at a later date. The RRSW and MSV contracts share a maximum value of $500 million.

The work will be performed at Kirtland Air Force Base, Albuquerque, NM. The contract with Millennium Engineering and Integration Co. includes a subcontract with Raytheon Co., of Tuscon, AZ. The agreement is for an indefinite-delivery, indefinite-quantity, cost-plus fixed-fee single award contract that began Wednesday and consists of a five-year period of performance.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC