Vote On Appropriations Bill, With Or Without VH-71, Likely To Be Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Nov 13, 2009

Vote On Appropriations Bill, With Or Without VH-71, Likely To Be Delayed

One Congressman Says Vote May Not Come Until December

A New York Congressman says the vote on the Appropriations Conference Bill could be delayed into December, in part over funding for the VH-71 Presidential Helicopter.

Rep. Maurice Hinchey

Congressman Maurice Hinchey (D-NY) says the House version of the Defense Appropriations Bill contains $485.2 million to make the first five VH-71's operational, but the Senate version does not. Congressman John Murtha (D-PA) said earlier this month that he would not push for inclusion of the funds in the conference report in a effort to not "embarrass the President" who is opposed to the funding. Murtha chairs the House Appropriations Defense Subcommittee.

Hinchey, who represents the district that is home to the Lockheed Martin facility in Owego, where the VH-71 would be assembled, said Murtha may have been misquoted in the Capital newspaper "The Hill."  He told the Binghamton Press Connects that Murtha is "under pressure from a variety of places that are opposed to continuing the VH-71."

Rep. John Murtha

Hinchey believes that if the program was funded, it could mean 600 jobs would return to Owego which were cut when it looked like the VH-71 was dead. Murtha spokesman Matthew Mazonkey did not comment on the article in "The Hill," saying "The House position on the presidential helicopter program is clear. We believe that it is in the best interest of taxpayers to make operational the five aircraft that have already been built."

FMI: http://appropriations.house.gov/Subcommittees/sub_def.shtml

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC