SpaceX Satellite Launch Delayed Until After ISS Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Jan 31, 2017

SpaceX Satellite Launch Delayed Until After ISS Mission

Says More Time Is Needed To Get Launch Pad 39A Ready For Use

The planned launch of an EchoStar communications satellite has been delayed until the middle of February to allow more time for SpaceX To ready Launch Complex 39A for its missions.

The EchoStar launch had been planned for Sunday, but SpaceX said that it was pushing that launch until after it boosts cargo to the International Space Station, which is planned for February 15. "This schedule change allows time for additional testing of ground systems ahead of the CRS-10 mission," SpaceX said in a statement.

The website The Seeker reports that SpaceX is reserving Pad 39B for launching its Falcon Heavy rockets when they are ready to fly. Pad 39A is, or course, where so many shuttle flights lifted off from the Kennedy Space Center.

The launch complex at the Cape Canaveral Air Force Station that had been the primary launch facility for SpaceX is still under repairs following the explosion of a Falcon 9 rocket on the pad last September.

(Image provided by NASA)

FMI: www.spaceX.com, http://spaceflightnow.com/launch-schedule/

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC