Tecnam P2012 ‘Traveller' Roll-Out On Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 06, 2015

Tecnam P2012 ‘Traveller' Roll-Out On Schedule

Event Planned For The Fourth Quarter Of This Year

Tecnam today announced that the production of the first TECNAM P2012 “Traveller” is progressing well on its Experimental Assembly Line (XAL) in Capua, Italy, with roll-out scheduled for Q4 2015.
The Tecnam P2012 Traveller is an eleven seat next generation piston engine twin, designed to comply with both FAR part 23 and EASA CS-23.

First verification tests of the preliminary P2012 design on the main aircraft elements such as the fuselage and tail planes have confirmed parameters declared in the initial production program.

Tecnam said in a news release that many airlines, from the US to Africa, Asia and Australia have been demanding a replacement for "heritage" airplanes in the FAR23/CS23 category currently in service around the world.

Tecnam’s Head of R&D, Prof. Luigi Pascale has designed the P2012 Traveller to enable operators to benefit from very low operating and maintenance costs in particular. Built to operative on even non-prepared runways, with easy and fast turnaround.

The P2012 Traveller has been designed to have high wing, fixed gear and two Lycoming TEO piston engines. Tecnam anticipates the P2012 delivering unbeatable Direct Operating Costs too.

The Tecnam P2012 Traveller will first see service as a passenger aeroplane but has been designed from the start to be a very versatile and flexible aerial platform, offering many multi role opportunities including Hydro, VIP, cargo shipping, parachuting and medevac services.

Initial flight-testing is expected by beginning of next year, as is the opening of the new P2012 Traveller production facility in Capua, Italy.

(Images provided by Tecnam)

FMI: http://p2012.tecnam.org

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC