Osprey Back In The Air | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Apr 08, 2004

Osprey Back In The Air

Tests Include Air-To-Air Refueling

The Navy's V-22 Integrated Test Team (ITT) recently flew the first air-to-air refueling flights since the program’s return to flight in May of 2002, an operation deemed successful.

Over the course of two one-hour sorties using Osprey No. 22, test pilots Marine Lt. Col. Kevin Gross and Steve Grohsmeyer each logged five "dry plugs" behind an Air Test and Evaluation Squadron (VX) 20 KC-130F operating near Naval Air Station Patuxent River (MD).

The primary reason for the flights was to re-establish Gross and Grohsmeyer’s day aerial refueling qualifications. Eventually, the ITT will have six pilots qualified to tank day and night, and at night while wearing night vision goggles--all part of the developmental test plan.

"Air-to-air refueling is an easy task in the V-22," Gross said after the flights. "The aircraft demonstrates positive and predictable characteristics in all axes, but especially in the thrust axis where the pilot’s ability to control closure rates is important."

Gross said this particular refueling exercise was done at airspeeds around 200 knots and an altitude of 10,000 feet.

Although Osprey No. 22 has an 11-foot fixed probe, the qualification flights were the initial step toward testing the new retractable refueling probe that will be installed on Osprey No. 21, currently being modified in Hangar 109 at Patuxent River. The developmental testing of the retractable probe will begin early next month and should last about three weeks. The retractable probe is just over 9 feet long when extended but is flush with the nose when stowed--a necessary feature for shipboard operations.

The V-22’s air-to-air refueling features are the cornerstone of the improvements in self-deployment capability and operational range over the legacy systems it will replace.

The air-to-air refueling developmental testing is just one area where the ITT is supporting Tilt-Rotor Operational Test Squadron (VMX) 22, the Osprey Test and Evaluation Squadron based at Marine Corps Air Station New River (NC) as they prepare for OPEVAL next year. Once developmental testing is complete--whether it is air-to-air refueling, formation flight, or shipboard operations--VMX-22 is cleared to begin operational testing in that area.

FMI: www.boeing.com/rotorcraft/military/v22

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC