Canada Lifts Grounding Of CH-149s | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Feb 21, 2004

Canada Lifts Grounding Of CH-149s

Cormorants Had Been Limited To SAR Ops Only

The Canadian Air Force is lifting a flight restriction on its fleet of 15 CH-149 Cormorant search and rescue helicopters that temporarily limited the aircraft to search and rescue operations only, following modifications to an engine fuel supply line.

The individual CH-149 Cormorant aircraft (Canadian Coast Guard varient shown below) will be able to be used for training flights as soon as they are modified.

The flight restriction meant that the Cormorants could only be flown for actual search and rescue missions: no training flights could be conducted until aircraft modifications were completed.

The fuel lines on all 15 Cormorants were inspected and no further defective lines were found. An over-sized Viton sleeve is fitted over the aircraft fuel lines to reduce the possibility of fuel being sprayed inside the engine compartment until new, re-engineered fuel lines can be produced and installed on all three engines of the aircraft to completely eliminate the problem.

The recent discovery of two leaking engine fuel lines prompted Major General Marc Dumais, Commander 1 Canadian Air Division, to impose the flight restriction as a precautionary measure on Feb. 5. "The Canadian Air Force will not take unnecessary risks with our people and equipment. I am satisfied that a proper solution to this problem is being implemented and that there will be no further occurrences of leaking fuel lines," said Major-General Dumais.

The engineering solution to the problem was developed by EH Industries, the aircraft manufacturer. The modifications to the fuel lines will be carried out by IMP, the aircraft maintenance contractor.

FMI: www.airforce.dnd.ca/index_e.htm

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC