But With 31 We Could've Gotten A Toaster! | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.22.25

AirborneNextGen-
12.23.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.18.25

AirborneUnlimited-12.19.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, May 11, 2004

But With 31 We Could've Gotten A Toaster!

Arianespace, EADS, Ink Deal For 30 Launches

As German Chancellor Gerhard Schroder and French Minister of Research Francois d'Aubert looked on, Arianespace and EADS signed a contract at the Berlin Air Show Monday for the production of 30 Ariane-5 launchers.

This contract, called "PA batch", will allow Arianespace to ensure its launch service continuity, to enhance its performance and competitiveness on the international launcher market. The first Ariane 5 of the PA batch will be launched in 2005. This batch will mainly consist of a configuration of standardized launchers Ariane 5 ECA. Besides this version of Ariane 5, the PA batch will also include Ariane 5 ES for the launches of the ATV (Automated Transfer Vehicle).

The contract signature of the PA batch is the implementation of the new role of EADS SPACE Transportation as single prime contractor of the Ariane 5 system. Its commitment is to deliver an integrated launcher to Arianespace in French Guiana. This means that the company manages from now the whole range of relations and contracts with the subcontractors covering launch vehicle production. As a result, EADS SPACE Transportation oversees the European cost reduction initiative and enhances production capabilities.

Arianespace is in charge of the commercial launch service operation. As "prime customer," the company will source the launcher from the prime contractor, adapt it to the customer mission requirements, integrates the satellites and farings, and carries out launch operations at Europe's Spaceport in Kourou, French Guiana.

The contract signing came on the heels of EADS successful drop-test of its space shuttle prototype, the Phoenix.


FMI: www.arianespace.com, www.eads.com

Advertisement

More News

Aero-TV: DeltaHawk’s Diesel Power Steps Into the Spotlight

Its Offerings Are Lighter, Cleaner, and Now Pushing Past 1,000nm on SAF Jet Fuel DeltaHawk’s diesel-powered aircraft lineup has seen incredible upgrades over the last few yea>[...]

NTSB Prelim: Mooney Aircraft Corp. M20K

The Airplane Experienced A Total Loss Of Engine Power On December 3, 2025, about 1600 central standard time, a Mooney Aircraft Corp. M20K, N57229, was substantially damaged when it>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (12.20.25)

Aero Linx: European Society of Aerospace Medicine (ESAM) As a pan-European, independent forum, it works to promote the safety and health of all persons involved in aviation and spa>[...]

Aero-News: Quote of the Day (12.20.25)

“We are excited to see Wisk achieve this milestone, and I’m so proud of the team that made it possible. The team at Wisk has built advanced technologies across flight c>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC