JP-4 Pipeline To Tucson Repurposed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Aug 22, 2003

JP-4 Pipeline To Tucson Repurposed

It Now Carries Auto Fuel To Gas-Starved Phoenix

Petroleum executives promise Tucson (AZ) won't run out of jet fuel, after a pipeline from Phoenix was 'retasked' this week to help the Valley of the Sun deal with a terrible gas crunch.

The decision from Kinder Morgan, the Houston-based company which owns a pair of pipelines between the two Arizona cities, came after all retail gasoline supplies in Phoenix dried up virtually at once. Of 313 filling stations in the Valley of the Sun, only 13 offered gasoline to drivers earlier this week.

Gas prices shot up to well over $2/gal., with some stations' reputedly charging upwards of $4/gal. (Arizona has no applicable anti-gouging laws.) The reason for the gas crunch? Kinder Morgan's other six-inch pipe between Tucson and Phoenix broke, leaving five homes awash in gasoline. Earlier this week, Kinder Morgan tested the gasoline line. It failed. That's when the company decided to rededicate the JP-4 pipe.

Robbing Peter To Pay Paul?

"Bypassing that segment of line is the fastest way to return gasoline deliveries to normal levels in the Phoenix market," said Tom Bannigan, Kinder Morgan's pipeline president. By repurposing the JP-4 line, Kinder Morgan is able to pump 35,000 more gallons of gas into Phoenix everyday. Of course, that's 35,000 gallons of jet fuel that won't be loaded on commercial and general aviation aircraft in Phoenix.

To make up the difference, Kinder Morgan says more JP-4 will be trucked into Tucson from El Paso and that supplies of jet fuel won't be affected. But the pipeline company made no mention of the increased costs of driving the fuel into Tucson. As motorists in Phoenix can attest, that might well cause a major spike in the price of jet fuel at the pump.

FMI: www.kindermorgan.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC