JP-4 Pipeline To Tucson Repurposed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Fri, Aug 22, 2003

JP-4 Pipeline To Tucson Repurposed

It Now Carries Auto Fuel To Gas-Starved Phoenix

Petroleum executives promise Tucson (AZ) won't run out of jet fuel, after a pipeline from Phoenix was 'retasked' this week to help the Valley of the Sun deal with a terrible gas crunch.

The decision from Kinder Morgan, the Houston-based company which owns a pair of pipelines between the two Arizona cities, came after all retail gasoline supplies in Phoenix dried up virtually at once. Of 313 filling stations in the Valley of the Sun, only 13 offered gasoline to drivers earlier this week.

Gas prices shot up to well over $2/gal., with some stations' reputedly charging upwards of $4/gal. (Arizona has no applicable anti-gouging laws.) The reason for the gas crunch? Kinder Morgan's other six-inch pipe between Tucson and Phoenix broke, leaving five homes awash in gasoline. Earlier this week, Kinder Morgan tested the gasoline line. It failed. That's when the company decided to rededicate the JP-4 pipe.

Robbing Peter To Pay Paul?

"Bypassing that segment of line is the fastest way to return gasoline deliveries to normal levels in the Phoenix market," said Tom Bannigan, Kinder Morgan's pipeline president. By repurposing the JP-4 line, Kinder Morgan is able to pump 35,000 more gallons of gas into Phoenix everyday. Of course, that's 35,000 gallons of jet fuel that won't be loaded on commercial and general aviation aircraft in Phoenix.

To make up the difference, Kinder Morgan says more JP-4 will be trucked into Tucson from El Paso and that supplies of jet fuel won't be affected. But the pipeline company made no mention of the increased costs of driving the fuel into Tucson. As motorists in Phoenix can attest, that might well cause a major spike in the price of jet fuel at the pump.

FMI: www.kindermorgan.com

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC