AWACS Techs Get Paperless Link | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Jul 15, 2003

AWACS Techs Get Paperless Link

The E-3 Sentry Airborne Warning and Control System became the first weapon system to provide technicians with a paperless link between an aircraft parts manual and the base supply system.

Technicians from the 552nd Equipment Maintenance Squadron have been participating in a test program for a parts ordering tool that provides an electronic link between AWACS parts manuals and the supply system. The ordering tool allows technicians to order parts in a totally paperless environment. The system eliminates the need to search for the part in a paper manual and type in all the information, which saves time and reduces errors.

“We did in 10 minutes what used to take hours,” said Tech. Sgt. Thomas Martin, 552nd EMS dock chief, in reference to a recent maintenance inspection. Basically, the tool allows the technician to electronically search for parts, click on the items to be ordered, review and query the required parts list and submit the request through the automated system.

This technology can eventually be applied to wireless local area network devices, such as rugged laptops, for maintenance. The new tool is expected to save at least 160 man-hours and 25 incorrect parts orders per day when fully implemented throughout the 552nd Air Control Wing here, officials said.

Although the system is not yet fully operational, users have noticed a significant reduction in time spent and are excited about the system’s capabilities, they said.

“Out of several projects I’m involved with, I see the need and benefit of (the ordering tool) to the Air Force in the long term,” said Master Sgt. Rick Celusta, the 552nd Maintenance Operations Flight superintendent. [Courtesy of Air Combat Command News Service]

FMI: www.af.mil

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC