AWACS Techs Get Paperless Link | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 15, 2003

AWACS Techs Get Paperless Link

The E-3 Sentry Airborne Warning and Control System became the first weapon system to provide technicians with a paperless link between an aircraft parts manual and the base supply system.

Technicians from the 552nd Equipment Maintenance Squadron have been participating in a test program for a parts ordering tool that provides an electronic link between AWACS parts manuals and the supply system. The ordering tool allows technicians to order parts in a totally paperless environment. The system eliminates the need to search for the part in a paper manual and type in all the information, which saves time and reduces errors.

“We did in 10 minutes what used to take hours,” said Tech. Sgt. Thomas Martin, 552nd EMS dock chief, in reference to a recent maintenance inspection. Basically, the tool allows the technician to electronically search for parts, click on the items to be ordered, review and query the required parts list and submit the request through the automated system.

This technology can eventually be applied to wireless local area network devices, such as rugged laptops, for maintenance. The new tool is expected to save at least 160 man-hours and 25 incorrect parts orders per day when fully implemented throughout the 552nd Air Control Wing here, officials said.

Although the system is not yet fully operational, users have noticed a significant reduction in time spent and are excited about the system’s capabilities, they said.

“Out of several projects I’m involved with, I see the need and benefit of (the ordering tool) to the Air Force in the long term,” said Master Sgt. Rick Celusta, the 552nd Maintenance Operations Flight superintendent. [Courtesy of Air Combat Command News Service]

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC