Boeing Grounds Dreamliner Test Jet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Sep 16, 2010

Boeing Grounds Dreamliner Test Jet

Engine Power Surge Halts Testing, Crews to Replace Engine

Boeing's new 787 Dreamliner took another ding last week as one of its five test jets experienced an engine power surge on one of its Rolls-Royce Group Plc engines before take off.

It's too soon to tell whether or not the test schedule will be affected, Yvonne Leach, a company spokeswoman told Bloomberg News.

The September 10 event  occurred shortly before a flight in Roswell, New Mexico, and the crew wasn’t in danger and the surge was isolated to one engine, Leach explained.

According to Boeing's website, the Dreamliner test fleet has completed 596 flights spanning more than 1,850 hours and is the first jetliner to have more than 50 percent of the primary structure - including the fuselage and wing - will be made of composite materials.

Boeing selected General Electric and Rolls-Royce to develop engines for the new airplane. Boeing says it is expected that advances in engine technology will contribute as much as eight percent of the increased efficiency of the new airplane, representing a nearly two-generation jump in technology for the middle of the market.


Boeing 787 Dreamliner/FILE PHOTO

However, the Dreamliner's first delivery has been plagued with complications and has been delayed six times in two years as Boeing deals with new materials, parts shortages, redesign work and a greater reliance on suppliers.

Aviation Week reports that tests on the replacement engine could happen as early as Friday and if satisfactory, the work being done at Roswell could resume the following day.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC