NASA Appoints Board To Investigate Shuttle Arm Incident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Mar 18, 2006

NASA Appoints Board To Investigate Shuttle Arm Incident

NASA has formed a board at the agency's Kennedy Space Center, Fla., to investigate the March 4 incident that damaged Space Shuttle Discovery's remote manipulator system (shuttle arm).

Hugo Delgado is chairman of the five-member investigation board. He is deputy director for the Office of the Chief Engineer at Kennedy. The board is supported by one ex-officio member, four advisors and administrative personnel.

Board functions include investigating the facts surrounding the incident, determining its probable cause, assessing the possibility of a recurrence and recommending corrective actions.

A final report is expected this summer.

One Inch Dent

On March 4 at about 10:10 p.m. EST, shuttle technicians inside a bridge bucket work platform device accidentally bumped into Discovery's robotic arm. The arm is a 50-foot-long, jointed extension used to grapple payloads, remove them from the payload bay and move spacewalking astronauts to various work platforms.

Inspections showed two indentations in the arm's outer bumper layer, a Kevlar-covered plastic, honeycombed structure designed to protect the arm from minor impacts. One of the indentations in the honeycombed layer is oval shaped, 0.115 inch deep and 1 inch in diameter.

The second indentation, also oval shaped, is 0.035 inch deep and 0.5 inch in diameter. Ultrasound inspections were performed once the Kevlar and honeycombed layer were removed.

Under the largest indentation was a small crack in the carbon-fiber composite, measuring 1.25 inches long and 0.015 inches deep. The arm was removed from the vehicle on Tuesday and will be sent back to the vendor for repair.

The shuttle is in Kennedy's Orbiter Processing Facility bay 3. It is undergoing preparations for the STS-121 mission to the International Space Station. The launch is targeted for no earlier than July 1.

FMI: www.nasa.gov/shuttle

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC