FALCON Phase 1 Contractors Selected | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 23, 2003

FALCON Phase 1 Contractors Selected

Nine contractors have begun work to place a small satellite or other payload weighing about 1,000 pounds into a low Earth orbit.

The project is part of the Force Application and Launch from the Continental United States, or FALCON, program. Task 1, Phase 1 on the small launch vehicle includes developing conceptual designs, performance predictions, cost objectives and development and demonstration plans.

Three more contractors have also begun work on the phase's Task 2, hypersonic weapon systems. This includes the common aero vehicle, the enhanced common aero vehicle and the hypersonic cruise vehicle.

The CAV will be an unpowered, maneuverable, hypersonic glide vehicle capable of carrying about 1,000 pounds of munitions with a range of about 3,000 nautical miles. The ECAV will offer greater range and improved maneuverability. The reusable HCV will be an independent aircraft capable of taking off from a conventional military runway and striking targets as far as 9,000 nautical miles away in less than two hours.

The goal of the joint Defense Advanced Research Projects Agency and Air Force program is to develop and validate in- flight technologies that will enable both a near-term (circa 2010) and far-term (circa 2025) capability to execute time-critical, prompt global-reach missions, while at the same time demonstrating affordable and responsive space lift, according to DARPA officials.

Task 1 contractors will receive between $350,000 and $540,000 each for their Phase I effort. Task 2 contractors will receive between $1.2 million and $1.5 million each. Subject to successful negotiations, each contractor will conduct a six-month system definition study within its respective task, said DARPA officials. At the end of Phase 1, DARPA and Air Force personnel will decide whether to proceed with Phase 2, a 36-month design and development effort.

FMI: www.defenselink.mil, www.darpa.mil/body/NewsItems/pdf/falcon_fs.pdf
 

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC