US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Tue, Aug 06, 2013

US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft

Plans Call For 117 P-8A Aircraft, Which Are Based On Boeing 737-800

The U.S. Navy recently awarded Boeing a $1.98 billion contract for 13 additional P-8A Poseidon aircraft, continuing the modernization of U.S. maritime patrol capabilities that will ultimately involve more than 100 P-8As. The contract includes long-lead funding previously approved by the Navy. 

The Navy has now ordered 37 of the 117 P-8As it is expected to buy. To date, 10 have been delivered. Based on the Boeing Next-Generation 737-800 commercial airplane, the P-8 provides anti-submarine, anti-surface warfare as well as intelligence, surveillance and reconnaissance capabilities. The P-8 is replacing the Navy’s P-3 aircraft. 

“We’re on budget and on schedule and the Navy will stand up initial operational capability of this transformational aircraft by the end of the year,” said Rick Heerdt, Boeing vice president and P-8 program manager. 

“This new contract award will continue to deliver aircraft to the fleet squadrons scheduled to receive their initial batch of P-8As on cost, schedule and performance parameters in accordance with the approved Acquisition Program Baseline,” said Capt. Scott Dillon, the Maritime Patrol and Reconnaissance Aircraft Program Office’s program manager.

Boeing assembles P-8As in the same facility where it builds all its 737s. The Poseidon team uses a first-in-industry in-line process that takes advantage of the efficiencies in the Next-Generation 737 production system. After initial assembly, the   P-8A aircraft enter a separate mission system installation and checkout facility for final modifications and testing.

Initial operational test and evaluation (IOT&E) was completed in March; the Navy announced July 1 that the P-8A program had passed IOT&E and the P-8A was ready for fleet introduction.

(P-8 Poseidon image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC