EPS Diesel Pre-Certification Evaluation Shows Promising Results | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jul 29, 2017

EPS Diesel Pre-Certification Evaluation Shows Promising Results

Has Undergone High Altitude And High Temperature Testing

By: Gene Yarbrough

Michael Fuchs presented preliminary testing results for the EPS 4.3 liter diesel engine in development during a media briefing at AirVenture.

The engine, an 8 cylinder 180 degree horizontally opposed mill, targeting the O-540/550 family has showed good performance in testing aimed at certification. The Graflight V-8 engine employs an electronic control system designed and manufactured by industry leader Bosch General Aviation Technology to dramatically reduce pilot workload and ensure efficiency and ease of operation. The engine is controlled with a single power lever, leaving traditional pilot chores like propeller pitch, fuel mixture and controlling engine temperature to the computer, reducing the risk of pilot error.

The engine is designed with extremely rugged technologies, like steel pistons and CGI iron crankcases that provide superior strength and durability over aluminum without sacrificing weight. This reduces maintenance costs significantly by increasing the targeted Time Between Overhauls (TBO) to 3,000 hours, a 50 to 100 percent increase over the industry’s current values of 1,500 to 2,000 hours.

The engine has undergone high altitude testing in Colorado and high temperature testing in Arizona, both efforts indicating operating in these extremes as expected with no adverse behaviors thus far. The engine is rated at 408 horsepower for takeoff and will maintain that output to 30,000 ft with an expected TBO of 3000 hrs.

Fuchs stated that although the development process is long and costly the company has funding in place to achieve their production certificate and enter production with first deliveries expected "soon" without committing to a firm date.

(Image from file)

FMI: eps.aero

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC