Navy MUOS-5 Satellite Transfer Maneuver Temporarily Halted | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Tue, Jul 12, 2016

Navy MUOS-5 Satellite Transfer Maneuver Temporarily Halted

Spacecraft Reconfigured Into Safe Intermediate Orbit

The fifth Mobile User Objective System satellite, which successfully launched aboard a United Launch Alliance Atlas 5 on June 24, was projected to reach its geosynchronous orbit and enter its test location 22,000 miles above Hawaii by July 3.

The satellite experienced an anomaly that required the transfer maneuver to be temporarily halted.

The Navy's Program Executive Office for Space Systems has reconfigured the satellite from orbital transfer into a stabilized, safe intermediate orbit to allow the MUOS team to evaluate the situation and determine options for proceeding.

MUOS-5 was launched as an on-orbit spare to provide immediate redundancy to the MUOS constellation, which is performing nominally. MUOS-5 is an on-orbit spare, and delay in reaching its test location will have no impact upon current legacy or Wideband Code Division Multiple Access satellite communications operations.

MUOS-1 through MUOS-4 are now in orbit and supporting operations via their legacy payloads that provide ultra high frequency satellite communications for the Department of Defense.

The Navy's Program Executive Office for Space Systems, located at the Space and Naval Warfare Systems Command in San Diego, is responsible for the MUOS program.

(Image provided with U.S. Navy news release)

FMI: www.public.navy.mil/spawar/PEOSpaceSystems

Advertisement

More News

Klyde Morris (10.27.25)

It Does Indeed Work Every Time, Klyde FMI: www.klydemorris.com>[...]

Airborne 10.27.25: MOSAIC Phase 1, Katana Returns, MOSAIC Town Hall!

Also: Orlando Air Show Cancelled, ATC Staffing Shortages, CH-47F Block II Chinooks, Sustainable $$ More than a decade of hard work, legal setbacks, and community advocacy has final>[...]

Airborne-NextGen 10.28.25: Police Drones, Nat'l Parks v UAVs, MOSAIC Phase 1

Also: MOSAIC Town Hall, Lockheed Martin Venus, Electric Aircraft Cooling, Korea Taps Archer The Miami-Dade Sheriff’s Office is at the front end of a year-long AI policing exp>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC