SC National Guard To Get New Helicopter Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Jan 20, 2011

SC National Guard To Get New Helicopter Facility

Two Hangars To Be Constructed At A Cost Of $26 Million

The South Carolina National Guard is set to begin construction on a $26 million, 111,000-square-foot aviation support facility for its helicopters.

The project, which is on the west end of the existing South Carolina Technology & Aviation Center in Greenville, SC, features two helicopter hangars and a central support area to facilitate flight operations. The 30-acre site will house three South Carolina Army National Guard units with 70 full-time personnel and 145 part-time soldiers.

The South Carolina Technology & Aviation Center features a public airport with an 8,000-foot primary runway. The center provides a strategic central location in the Southeastern United States as well as inland protection from hurricanes and extreme weather.

The aviation support facility will feature two maintenance hangars that will house six CH-47 Chinook and four UH-72 Lakota helicopters. The central portion will include an engine shop equipped for aircraft maintenance and repair, men's and women's lockers, flight instruction and operations rooms, an emergency aviation operations center, and offices for administrative support.


Lakota File Photo

"This project is particularly challenging because of its large size and location next to a busy airport," said Roger Hendrick, president of North Carolina-based Hendrick Construction, which will build the facility. "We're excited to work with the South Carolina National Guard and deliver this state-of-the-art aviation facility." Construction will begin this month and is scheduled to be complete in approximately two years.

FMI: www.scguard.army.mil

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC