First Flight Test For Upgraded C-130 Successfully Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Fri, Jul 22, 2016

First Flight Test For Upgraded C-130 Successfully Completed

Modifications Made By Elbit Systems For Israeli Air Force Airplane

A successful first flight test was recently completed for the C-130H (Hercules) transport aircraft upgraded by Elbit Systems for the Israeli Air Force (IAF), under an agreement signed with the Israeli Ministry of Defense. This initial flight test was the first in a series of flight tests, and future flight tests were agreed upon and will be performed in the coming months.

During the flight tests, the aircraft;s systems performance was tested in various modes of operation and in a variety of flight altitudes and conditions, in both day and night. The test demonstrated “out of the window” flight, in which live video was displayed on the head-up display (HUD), presenting flight and navigation data overlaying the real world by using two and three dimensional symbols, enhanced degraded visual landing applications and head tracking capabilities.

Airborne refueling was also demonstrated as part of the flight tests. The IAF pilots were impressed with the new capabilities, and the feedback was positive. They emphasized the contribution to flight safety of the new configuration and the enhanced situational awareness gained in different phases of the flight. They also noted the reduced workload and the improved cockpit communication due to flight in “head out” orientation.

The modernization project, which began in 2012, extends the operational life of the aircraft and significantly improves its operational capability, particularly in precision flying, low-level night flight and operations in adverse weather. The modernization not only contributes to improved flight safety but also reduces operating costs by introducing cutting-edge digital systems to replace obsolete analog systems that have become unreliable and costly to maintain after four decades of intensive service.

(Image provided with Elbit Systems news release)

FMI: www.elbitsystems.com

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC