Eurodrone Passes Preliminary Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Sun, May 19, 2024

Eurodrone Passes Preliminary Design Review

Process Paves The Way To Proceed With The Detailed Design

The Eurodrone program has successfully performed a Preliminary Design Review (PDR). With Airbus Defence and Space as prime contractor, this milestone has been completed with OCCAR and representatives of the four customer nations (France, Germany, Italy and Spain) in the presence of the three Major Sub-Contractors (MSC), Airbus Defence and Space Spain, Dassault Aviation and Leonardo. 

The PDR proves that the initial design of the aircraft has matured, paving the way to proceed with the detailed design. It is the outcome of different technical assessments and evaluations conducted, such as Wind Tunnel Testing to confirm the aerodynamic configuration of Eurodrone, the overall design to ensure demonstration of operational capability, and the validation of a fully representative Digital Twin. 

Supported by and based on the knowledge already gathered, the Eurodrone programme enters into a new phase to reach the Critical Design Review (CDR), which will represent the final step and closure of architecture and system design.

“Performing the Preliminary Design Review for the development of Eurodrone represents an important step forward for this key European defence programme”, said Jean-Brice Dumont, Head of Air Power at Airbus Defence and Space. “It shows a real joint effort and collaborative spirit from all industrial partners and the Customer community to ensure European sovereignty and independence in this critical segment of unmanned long endurance ISTAR capability.”

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (10.31.25): Minimum Sector Altitude [ICAO]

Minimum Sector Altitude The lowest altitude which may be used under emergency conditions which will provide a minimum clearance of 300 m (1,000 feet) above all obstacles located in>[...]

ANN's Daily Aero-Linx (10.31.25)

Aero Linx: African Civil Aviation Commission (AFCAC) At AFCAC, our Safety Strategic Objective is to enhance Aviation Safety and the efficiency of Air Navigation Services in Africa.>[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Airborne 10.30.25: Earhart Search, SpaceX Speed Limit, Welcome Back, Xyla!

Also: Beech M-346N, Metro Gains H160 EMS STC, New Bell Boss, Affordable Flying Expo Tickets NOW On Sale! Purdue University’s Research Foundation and the Archaeological Legacy>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC