First Major Assembly Of Boeing's 787 Arrives In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Apr 26, 2007

First Major Assembly Of Boeing's 787 Arrives In Everett

Horizontal Stab 'Dreamliftered' From Italy

Representatives with Boeing tell ANN that final assembly for the all-new Boeing 787 Dreamliner is one step closer, with the April 24 arrival in Everett, WA of the first aircraft's horizontal stabilizer.

Manufactured by Alenia Aeronautica at its facility in Foggia, Italy, the horizontal stabilizer is transported in five pieces -- the left and right stabilizer, two elevators and a center.

The shipment configuration measures nine feet wide, 13 feet high and is 42 feet long. It was delivered to Boeing late Tuesday night via the Dreamlifter, a specially modified 747-400 used to transport 787 major assemblies.

The horizontal stabilizer was loaded into position in the 787 final assembly bay Wednesday morning. The completed assembly has a wing span of approximately 62 feet, and measures 32 feet fore/aft.

"In the coming weeks we will receive other major assemblies for the first Dreamliner," said Scott Strode, 787 vice president of Airplane Definition and Production. "This is a very exciting time for the program."

Boeing currently has firm orders for 544 airplanes from 44 airlines. Rollout of the first 787 is planned for July 8 of this year, with first flight following about two months later.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC