Lockheed Martin 'Disappointed' By Orion Cancellation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-01.13.25

Airborne-NextGen-01.14.25

Airborne-Unlimited-01.15.25

Airborne-FltTraining-01.16.25

Airborne-Unlimited-01.17.25

Fri, Feb 05, 2010

Lockheed Martin 'Disappointed' By Orion Cancellation

Program Scuttled In FY2011 NASA Budget Proposal

Lockheed Martin says it is "keenly disappointed" by the Administration's budget proposal for NASA that would cancel Project Orion as part of an elimination of NASA's Constellation Program.

In a prepared statement released Wednesday regarding the FY2011 budget request, which cancels the Orion Project as part of NASA's Constellation Program, the company said Orion's maturity is evident in its readiness for a first test flight in a matter of weeks. "In fact," the statement reads, "Orion can be ready for crewed flights to low Earth orbit and other exploration missions as early as 2013, thus narrowing the gap in U.S. human space flight capability when the shuttle is retired later this year."

Orion In Lunar Orbit Artists Concept

"Significant investment has already been made by the nation and private industry in Orion, which is human rated to provide a level of safety unmatched by any previous or currently proposed crewed vehicles," the statement continued. "Nearly 4,000 people at more than 500 commercial companies and hundreds of small business suppliers across the country have worked diligently on the Orion project to support the nation's human space flight efforts. New facilities have been built and others upgraded. Innovative technologies such as a launch abort system, autonomous rendezvous and docking, closed-loop life support systems, state of the art solar power and avionics systems have been incorporated. And the next-generation of engineers, scientists, teachers and students, so critical to America's future, has been inspired. Cancellation of Orion would sacrifice these capabilities and accomplishments."

The President's budget proposal is subject to review and approval by Congress.

FMI: www.lockheedmartin.com

Advertisement

More News

NTSB Prelim: Vans RV-7A

Unable To Make It To E63, The Pilot Initiated A Forced Landing To A Field With Tall Desert Vegetation On December 22, 2024, about 1639 mountain standard time, an experimental amate>[...]

ANN's Daily Aero-Linx (01.19.25)

Aero Linx: HH-60G Pave Hawk The primary mission of the HH-60G Pave Hawk helicopter is to conduct day or night personnel recovery operations into hostile environments to recover iso>[...]

ANN's Daily Aero-Term (01.19.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (01.20.25)

Aero Linx: X-51A Waverider The experimental X-51A Waverider is an unmanned, autonomous supersonic combustion ramjet-powered hypersonic flight test demonstrator for the U.S. Air For>[...]

Airborne 01.15.25: FBI Drone Most Wanted, XB-1 Hits .95M, SnF25 Coverage Plans

Also: 727 Sold 4 $10K, Hartzell Carbon Voyager, Duffy Supported, FL Airpost Name Change The FBI is not kidding around with the pilot of the drone that was involved in a mid-air col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC