FAA: Put Down The Shovels And Step Away From The Landfill | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Oct 12, 2004

FAA: Put Down The Shovels And Step Away From The Landfill

Agency Orders Work Halted On Landfill Near Williamson County Airport

Developers of a Southern Illinois landfill will have to stop work immediately, after the FAA said they hadn't filed the proper paperwork.

As ANN reported in August, government officials were worried that the landfill was too close to the airport. Moreover, the FAA says the developer of the 189-acre landfill is thinking about changing the purpose of the landfill from household waste to demolition or construction waste. But FAA spokesman Tony Molinaro said the Kibler Development Corporation hadn't filed any paperwork on the change. No paperwork, no landfill.

The site, which was already being surveyed by Kibler, is close to the Williamson County Airport near Marion (IL). While the company had planned to finish an access road into the site, Molinaro told the Southern Illinoisan that Kibler "must first file paperwork asking us to do a compatibility study. Nothing can be pursued (on their end) until that study is completed and we come to a decision on whether or not to grant permission for that construction."

Molinaro said a compatibility study would take 60 to 90 days to complete.

"We look at the safety of the airport first," he told the Southern Illinoisan. "If we can be assured that the landfill will be used only for construction waste and not grow beyond a certain height, then and only then may permission be granted to build the landfill.

"But let me make it clear that we will need exact information from the developer about the location of the landfill, for example, what kind of waste will be disposed, the projected lifespan of the landfill, and more."

The issue with household garbage is that it can rot, creating explosive gases. Kibler says, by switching from a household waste landfill to a demolition landfill, the company needs no approval from the FAA. Molinaro says, think again. 

FMI: www.faa.gov


Advertisement

More News

TikToker Arrested After Landing His C182 in Antarctica

19-Year-Old Pilot Was Attempting to Fly Solo to All Seven Continents On his journey to become the first pilot to land solo on all seven continents, 19-year-old Ethan Guo has hit a >[...]

Classic Aero-TV: Versatile AND Practical - The All-Seeing Aeroprakt A-22 LSA

From 2017 (YouTube Edition): A Quality LSA For Well Under $100k… Aeroprakt unveiled its new LSA at the Deland Sport Aviation Showcase in November. Dennis Long, U.S. Importer>[...]

ANN's Daily Aero-Term (06.27.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (06.27.25)

Aero Linx: Historic Aircraft Association (HAA) The Historic Aircraft Association (HAA) was founded in 1979 with the aim of furthering the safe flying of historic aircraft in the UK>[...]

Aero-News: Quote of the Day (06.27.25)

"We would like to remember Liam not just for the way he left this world, but for how he lived in it... Liam was fearless, not necessarily because he wasn't afraid but because he re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC