Crane Co. Reaches Agreement with GE and Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jan 02, 2010

Crane Co. Reaches Agreement with GE and Boeing

Dispute Over Dreamliner Braking System Software Resolved

Industrial products manufacturer Crane Co. announced Wednesday that it had executed agreements with GE Aviation Systems LLC and The Boeing Company resolving its claims relating to the brake control monitoring system for the Boeing 787. Under the agreements, Crane’s supply contract will now be direct to Boeing.

Eric Fast, Crane Co. President and Chief Executive Officer, stated: “We are very pleased to have resolved this matter. We look forward to continuing our traditional successful supplier relationship with Boeing and working with GE on the landing gear system.”

As ANN reported in July of 2008, Boeing said there was a problem in the control software used in the plane's brake monitoring system. GE Aviation Systems subcontracted the work to Hydro-Aire, part of Crane Aerospace and Electrics. Boeing said Crane had to go back and rewrite parts of the brake control code to comply with certification standards.

"We need to push harder on the brake system" in order to achieve Boeing's certification targets, Shanahan told Reuters at the time. "It's not that the brakes don't work, it's the traceability of the software."

Crane will resume work, on a funded basis, on a modified version of the brake control monitoring system. Crane will receive payments aggregating $18.9 million in early 2010 associated with its claims.

FMI: www.craneco.com, www.boeing.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC