Airbus Jet Deliveries Delayed By Shutdown | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 08, 2013

Airbus Jet Deliveries Delayed By Shutdown

JetBlue, US Airways Can't Get Their New Airplanes

Airbus deliveries to JetBlue and US Airway have been delayed by the partial government shutdown which went into effect last week.

That's because new airplanes have to be registered by the federal government, and the part of the government that handles such registrations has been closed by the shutdown. The two airlines had sent representatives to Europe to celebrate the deliveries, but Forbes reports that they flew home on commercial flights rather than riding home on the new airplanes.

Airbus spokesman Clay McConnell said the company is "trying to help the airlines figure this out," but without an N-number assigned by the government, the aircraft cannot operate for a U.S. carrier.

Over at Boeing, things are a little different. The FAA granted Boeing organization designation authorization (ODA), which allows the company to perform some of its own certification work. In a statement, the U.S. planemaker said that it would not be entirely unaffected by the shutdown. "(B)ecause some FAA employees retain certification duties for some of our products, deliveries of airplanes with new configurations or those delivered from Boeing South Carolina could be delayed during the shutdown. Also, certification of some our development programs could potentially be slowed or delayed,” the company said.

Two Dreamliners assembled in South Carolina were delivered last week.

FMI: www.faa.gov, www.airbus.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC