Boeing To Start Building First Next-Generation 737 At Increased Production Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Feb 06, 2014

Boeing To Start Building First Next-Generation 737 At Increased Production Rate

Single-Aisle Airplane Production Increases To Record 42 Per Month

Boeing is starting assembly this week of the first Next-Generation 737 to be built at the increased rate of 42 airplanes per month. Since 2010, production of the 737 has increased about 33 percent, from 31.5 to 42 airplanes a month, its highest rate ever.

Early Wednesday morning, mechanics loaded initial parts of the spars – internal support structures in the wings – into an automated spar-assembly machine. The spar is the first step in building the wings and marks the start of the assembly of the airplane at the Renton, WA factory.

"This rate increase once again reflects our commitment to put the world's best-selling airplane into the hands of our customers as quickly as possible," said Beverly Wyse, vice president and general manager, 737 Program, Boeing Commercial Airplanes. "Efficiency improvements in the factory, many of them developed by our employees, are a big part of why we are able to successfully increase the number of airplanes we build." 

The first Next-Generation 737 built at the new rate is scheduled to be delivered in the second quarter. As previously announced, the 737 production rate is scheduled to increase to 47 airplanes a month in 2017.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC