First Flyable A350 XWB 'MSN-001' Structurally Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 05, 2012

First Flyable A350 XWB 'MSN-001' Structurally Complete

Aircraft Makes Its 1st Journey 'On Wheels'

Airbus has successfully completed the main structural assembly and system connection of A350 XWB ‘MSN-001’ – the first flight-test aircraft. The aircraft is shown here on its wheels for the very first time moving out of the main assembly hall (Station 40) at the recently inaugurated “Roger Béteille” A350 XWB Final Assembly Line in Toulouse. It then entered the adjacent indoor ground test station (Station 30).

The assembly work performed in Station 40 included the successful electrical power-on of the aircraft's entire fuselage and wings. Soon work in Station 30 will start by testing the aircraft's hydraulic system, followed by the full electric and hydraulic power-on of the aircraft which will be completed by around the end of the year. This will mark the start of several weeks of comprehensive functional system testing.

After the A350 XWB MSN-001 exits station 30, the aircraft will go through a series of extensive production and certification / development tests, be painted and have its engines installed. It will then be delivered to the flight-line and be readied for its first flight in mid-2013.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC