Lockheed Martin Opens Development Laboratory For Orion, Constellation Programs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.09.24

Airborne-NextGen-09.10.24

Airborne-Unlimited-09.11.24

Airborne-AffordableFlyers-09.12.24

Airborne-Unlimited-09.13.24

Sun, Dec 16, 2007

Lockheed Martin Opens Development Laboratory For Orion, Constellation Programs

Houston Facility Near Johnson Space Center

Lockheed Martin announced this week the opening of its new space Exploration Development Laboratory in a ceremony dedicating the facility to support the National Aeronautics and Space Administration's (NASA) Project Orion and Constellation Program.

The new 10,000 sq. ft. Exploration Development Laboratory was funded by Lockheed Martin and its teammates United Space Alliance and Honeywell as part of an integrated EDL network that includes facilities in Denver, CO, Glendale, AZ and Arlington, VA. The EDL network is designed to reduce cost and schedule risk by providing an early opportunity to perform systems level avionics and software testing for Orion in a realistic environment in the development phase of the program.

"The Exploration Development Lab provides a tremendous benefit to NASA and the Lockheed Martin team as we begin a very robust test program for Orion," said Cleon Lacefield, vice president and program manager of Project Orion for Lockheed Martin Space Systems. "We are very excited to have the EDL ready and operational for Orion and Constellation so early in the development phase of the program. Testing in this new facility has already begun and we successfully completed the first Pad Abort 1 avionics systems test for Orion last week."

The EDL in Houston is located adjacent to NASA Johnson Space Center, enabling the Lockheed Martin team to work closely with NASA's Project Orion and Constellation Program early in the development and testing phase to gain clarity on requirements. This location allows the team to take full advantage of the breadth of human space flight experience in Houston, including early involvement and collaboration with astronaut flight crew members and flight controllers.

Initial testing of critical systems will be done in the EDL, including the Guidance, Navigation, and Control (GN&C), Automated Rendezvous and Docking (AR&D), crew interfaces, and software development processes. Avionics system testing will be performed to reduce risk prior to abort flight testing at White Sands Missile Range and NASA Kennedy Space Center.

EDL testing also will include system integration tests and mission tests that employ the team's "test like you fly" philosophy. The Lockheed Martin team also is working closely with NASA on a Human Engineering mockup that will be used to perform fact finding activities, such as reach zone, panel displays, internal lighting assessment, seat mockup and development, docking hatch development, crew stowage, hand controller development, and other human interface devices.

Following EDL testing, the next phase of tests will be done at NASA's CEV Avionics Integration Laboratory (CAIL). Verification of requirements in the EDL ensures that certification in the CAIL will be successful, greatly reducing software development risk.

Orion is America's next-generation human spaceflight vehicle that will transport up to six astronauts to and from the International Space Station and up to four to the moon and destinations beyond, beginning in 2015 after the space shuttle is retired.

FMI: www.lockheedmartin.com, www.nasa.gov, www.ulalaunch.com, www.honeywell.com

Advertisement

More News

ANN's Daily Aero-Linx (09.12.24)

Aero Linx: Simsbury Fly-in and Car Show Simsbury Airport is situated in the picturesque Connecticut foothills in north central Connecticut. It is operated by the Simsbury Airport A>[...]

ANN's Daily Aero-Term (09.12.24): LORAN

LORAN An electronic navigational system by which hyperbolic lines of position are determined by measuring the difference in the time of reception of synchronized pulse signals from>[...]

NTSB Prelim: Apex Cross-5X

The Pilot Did Not Have Any Pilot Certificates Or Ratings On September 2, 2024, about 1215 central standard time, an Apex Cross-5X weight shift trike, N223CL, was substantially dama>[...]

Airborne Affordable Flyers 09.06.24: MOSAIC AWOL, Aeropilot L600, Shark Attack!

Also: Lakeland's Affordable Flyer Expo, Introducing The Dingo, Gyro Technic, Zenith Gathering ANN is enjoying the comradery, hospitality and cool vibes at the MidWest Sport Aviatio>[...]

Airborne 09.11.24: GA Sales Report, Teeny New DJI Drone, Polaris Dawn Launches

Also: KSM Food Truck Fly-In, 1700th ATR, Sportys' Updates, 'Fund an Angel' The General Aviation Manufacturers Association issued the Second Quarter 2024 General Aviation Aircraft S>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC