Clifford Development Update: Citation II and Citation SII STC Programs On Track | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Nov 30, 2007

Clifford Development Update: Citation II and Citation SII STC Programs On Track

Citation II and Citation SII Re-Engining With Williams Engines

Clifford Development tells ANN that their re-engining projects for the Citation II and Citation SII are on track for an STC in early 2008. When certified, both airplanes will be equipped with Williams International FJ44-3A engines, plus 36 improvements to the airframe and its systems.

The Citation II certification airplane is currently undergoing flight tests. Flight Test Associates, LLC of Mojave, Calif. has equipped the Citation II certification airplane with its proprietary data acquisition system that captures 64 parameters at a nominal rate of two per second. Datasets include flight parameters, principle engine parameters, system temperatures and pressures, GPS and DGPS positions and strain gauge readings. Fifty flights of 2.5 hours each will be concluded in December. Federal Aviation Administration (FAA) flight tests are anticipated for January 2008.

"We are particularly pleased with our relationship with Flight Test Associates," noted Jim Clifford, chief executive officer of Clifford Development.

"The rich data that are captured from these test flights will equip us to develop a detailed pilot's operating handbook with comprehensive performance charts."

Initial flight test results for the Citation II support the original performance estimates of the Williams engine conversion including a long range cruise speed improvement of +21 percent and an NBAA IFR range improvement of +29 percent.

Working from a newly renovated 20,000 sq. ft. facility in Kalamazoo, Mich., Great Lakes Aviation, a Clifford Development engineering partner firm, has begun the physical modification of the Citation SII certification airplane. This airplane is on track for first engine runs in December and an abbreviated flight test program in early 2008.

"Based on the commonality between the Citation II and SII, we are achieving significant efficiencies with the parallel certification of two airplanes. We anticipate that the Citation II and the Citation SII will be certified sequentially in March and April of 2008," noted Clifford. "More than 25 engineers and technicians have been added at Great Lakes Aviation to support our certification programs."

The 2008 Citation II and SII engine conversions are priced at $2,150,000 and $2,275,000 respectively, and both conversions include 36 systems improvements, nacelles, engines, installation and training. Prices include a credit for original engines. Installations will be handled by designated service centers.

FMI: www.clifforddevelopmentgroup.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC