NASA Seeks Concept Proposals For Ares V Heavy Lift Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 07, 2009

NASA Seeks Concept Proposals For Ares V Heavy Lift Rocket

Phase One RFP Covers Development Requirements

On Monday, January 5, NASA issued a request for proposal for the Ares V rocket that will perform heavy lift and cargo functions as part of the next generation of spacecraft that will return humans to the moon.

The RFP is for Phase I concept definition and requirements development for the Ares V rocket. Proposals are due to NASA's Marshall Space Flight Center in Huntsville, AL no later than 1:00 pm CST on February 9.

The request for proposal defines the procurement approach for Phase I of the Ares V acquisition. The contract work will include developing products to enable NASA to successfully complete the system requirements review and system definition review, critical milestones in the development of the rocket. Completion of the system definition review will verify the design concept and demonstrate mission objectives can be met.

The solicitation includes five separate work packages available for bid. Work packages one through four include the payload shroud that will protect the Altair lunar lander during launch, the Earth Departure Stage, the core stage, and avionics and software. The products for these work packages include assessing point of departure architecture, assessing risks and opportunities, trade studies and analysis, assessment of NASA requirements and a final report. The fifth work package includes a first stage concept for an upgraded solid rocket fueled booster.

Marshall will manage the contracts, which will be awarded through a full and open competition. The selections will be made in the spring of 2009. The period of performance for each contract is 18 months with two, one-year options.

FMI: Read The RFP

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC