Flight Testing Begins For 'Soon-To-Be-Certified' Seawind | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Mar 19, 2010

Flight Testing Begins For 'Soon-To-Be-Certified' Seawind

Full Flight Test Program To Be Conducted In Ottawa

After completing all the ground testing, the 'soon-to-be-certified' Seawind 300C received its flight permit and took its initial flight over Saint-Jean-sur-Richelieu, Canada. The Canadian National Research Council (NRC) will perform the flight test piloting under the direction of DAR Chief Test Pilot Robert Erdos.  The flight analytical work will be performed by John Taylor, who recently retired as Vice President of Engineering at Bombardier.

The Seawind will be manufactured at the company's 82,000-square-foot manufacturing and hangar facility at Saint-Jean-sur-Richelieu Airport in Quebec, Canada.

The flight test aircraft was piloted on its first flight by Paul Kissman, and the NRC's Harvard chase plane was piloted by Anthony Brown, both of whom are NRC test pilots.  The initial flight lasted about an hour, as Kissman got familiar with the amphibian. Richard Silva, President of Seawind, said, "The pilots reported the controls in pitch and roll were excellent.  The doublet on the rudder was very good with a light two cycle Dutch roll to be expected on the close coupled amphibian.  The power plant and aircraft systems all worked as designed and as expected."

After the debriefing, the Seawind was flown to Ottawa, where the full flight testing program will be conducted. 

Silva said, "It will take about four weeks for the NRC to install the flight test instrumentation, after which full flight testing will begin. "We are looking forward to the completion of flight testing and the start up of production.  We have a backlog of over 50 customer orders."

The Seawind program has been an on-and-off going program for a number of years and suffered its most significant setback after a fatal accident in 2007 claimed the life of a test pilot.

FMI: www.seawind.net

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC