STS-125: Three Out Of Five Spacewalks Successfully Completed So Far | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 17, 2009

STS-125: Three Out Of Five Spacewalks Successfully Completed So Far

"Batting 1000" To This Point

STS-125 mission specialists John Grunsfeld and Drew Feustel finished the mission’s third spacewalk Saturday at 4:11 p.m. EDT. The spacewalk lasted 6 hours, 36 minutes. During the endeavor outside the shuttle, Feustel and Grunsfeld removed the Corrective Optics Space Telescope Axial Replacement and installed in its place the new Cosmic Origins Spectrograph. They also completed the Advanced Camera for Surveys electronic card replacement work. The spacewalkers were ahead of schedule and were able to complete part 2 of the ACS repair, installing a new electronics box and cable.

Space shuttle Atlantis’ 11-day mission is the final shuttle flight to NASA’s Hubble Space Telescope. The seven-member crew will enhance the observatory and ensure cutting-edge science. The mission puts in place advanced technology that improves the telescope’s discovery power by 10 to 70 times. The five scheduled spacewalks will install new instruments and thermal blankets, repair two existing instruments, refurbish subsystems and replace gyroscopes, batteries and a unit that stores and transmits science data to Earth. The result will be six working, complementary science instruments with new capabilities, and an extended operational lifespan through at least 2014.

Saturday, the spacewalkers focused on the installation of the telescope’s new Cosmic Origins Spectrograph and completed the Advanced Camera for Surveys repair work. Engineers from the Space Telescope Operations Control Center at Goddard Spaceflight Center in Maryland powered up both components and reported good aliveness tests. More tests will be conducted during the astronauts sleep period.

On Sunday, starting at 9:16 a.m., astronauts Mike Good and Mike Massimino will repair the Space Telescope Imaging Spectrograph and install the New Outer Blanket Layer during the fourth STS-125 spacewalk.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC