Flight Design Issues Service Bulletin For CTSL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Dec 02, 2019

Flight Design Issues Service Bulletin For CTSL

Covers Installation Of Starter Solenoid With Large SLA Battery

Flight Design has issued a service bulletin covering the installation of the starter solenoid on many CT and CTLS models. According to the document, some CTLS are equipped with a larger sealed lead acid battery, which requires a different location of the starter solenoid. Under certain unfavorable combination of tolerances, contact of the starter solenoid may contact the throttle cable housing, which in return gets worn through over time. An unprotected electric short circuit may be the result.

The bulletin estimates that inspecting the solenoid installation should take about 10 minutes, while corrective action, if required, would take about two hours to complete. Both the inspection and correction must be done by an A&P Mechanic,LSA Repairman, Owner/Operator with Sport Pilot certification or higher, Part 145 Repair Station, Flight Design Service Center.

Conduct of this SB must be logged in the aircraft documentation by A&P Mechanic, LSA Repairman, Owner/Operator with Sport Pilot certification or higher, Part 145 Repair Station, or a Flight Design Service Center to return the airplane to service.

To inspect the solenoid installation:

  • Open the cowling
  • Identify the throttle cable housing of the right carburetor
  • Identify the starter solenoid
  • Determine the distance between Bowden wire and contacts of the solenoid
  • Distance should be at least 15mm-1/2 inch (a finger should fit in between)

Corrective procedure:

  • Disconnect battery
  • Detach solenoid from firewall
  • Turn solenoid by 180 degrees (need to detach starter wiring temporarily)
  • If needed prepare an adaptor plate to relocate the solenoid for correct distance to throttle cable housing.
  • Properly attach solenoid and starter wiring.
  • Reconnect battery.
  • Close cowling.

(Image from Flight Design news release)

FMI: Service Bulletin

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC