First Ares I-X Parts Arrive In Florida | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Wed, Nov 05, 2008

First Ares I-X Parts Arrive In Florida

Test Flight Of First Stage Targeted For July 2009

The first major flight hardware of the Ares I-X rocket has arrived in Florida to begin preparation for the inaugural test flight of the agency's next-generation launch system. The test flight is targeted for July 12, 2009.

The Ares I-X upper stage simulator traveled to Port Canaveral aboard the Delta Mariner, a ship that also transports the Delta IV rocket for United Launch Alliance.

As ANN reported, the journey began October 22 on the Ohio River as the barge traveled toward the Mississippi River for its voyage to Port Canaveral. By November 6, the flight hardware will have been moved off the barge into high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center.

The upper stage simulator consists of 11 individual components that were designed and manufactured during a two-year period at NASA's Glenn Research Center in Cleveland. The components represent the size, outer shape and weight of the second stage of the Ares I rocket, and will be integrated together in the Vehicle Assembly Building. The upper stage simulator eventually will be stacked atop the solid rocket booster segments of the Ares I-X rocket.

The Ares I-X test flight will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with the Ares I crew launch vehicle. It also will allow NASA to gather critical data during ascent of the integrated Orion crew exploration vehicle and the Ares I rocket.

NASA says the data will ensure the entire vehicle system is safe and fully operational before astronauts begin traveling to orbit.

FMI: www.nasa.gov/ares

Advertisement

More News

Aero-News: Quote of the Day (11.02.25)

"Aero-News has been working with SUN n FUN as their media partner for the better part of a decade and gotten to know their crew quite well... but this cooperative undertaking has p>[...]

ANN's Daily Aero-Term (11.02.25): Inner-Approach OFZ

Inner-Approach OFZ The inner-approach OFZ is a defined volume of airspace centered on the approach area. The inner-approach OFZ applies only to runways with an approach lighting sy>[...]

Classic Aero-TV: MultiGP Drone Racing - Aviation’s New Action Sport

From 2017 (YouTube Edition): Pilots Competed For $10,000 For A First Place Finish… Drone Racing came to the Sebring Sport Aviation Expo in January, with pilots competing for>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Airborne 10.29.25: X-59 Flies!!!, Kings Aid CFIs, Shutdown Hurts ATC Training

Also: AIR Loses eVTOL Demonstrator, USCG Getting New Helos, Freighter Fleet To Grow, US Army Falls Behind Lockheed Martin Skunk Works, in partnership with NASA, successfully comple>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC