United Airlines' First 787 Makes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Aug 22, 2012

United Airlines' First 787 Makes First Flight

Initial Trip Around The Seattle Area To Check Systems, Controls

United Airlines' first 787 Dreamliner has completed its first production flight as Boeing makes final preparations for delivering it to United at the end of September. The aircraft took off from Boeing's Paine Field in Everett, WA, on Sunday. Boeing pilots flew the 787 around the Seattle area for more than three hours as part of planned tests of the aircraft's controls and systems.

During the flight, crew members examined the 787's onboard systems at high and medium altitudes. They also checked backup and safety elements, including cabin pressurization, avionics, navigation and communications systems.

Sunday's flight was part of a series of work that Boeing performs after each 787 comes out of its paint hangar and before airlines take delivery of the planes. The work also includes fueling, systems tests, engine runs and taxi tests.

United has 50 of the Dreamliners on order, along with 100 Boeing 737 MAX 9 aircraft and 25 Airbus A350XWBs. The airline is the U.S. launch customer for the Dreamliner, and this first airplane came out of the paint hangar on August 1st.

(Image provided by UCH)

FMI: www.united.com, www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC