First B-1Bs Resume Flight Operations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.09.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.11.24

Tue, May 11, 2021

First B-1Bs Resume Flight Operations

Stand-Down Ordered After An April 8 Ground Emergency

The first B-1B Lancers resumed flight operations May 3 following a safety stand-down issued April 20 by Gen. Tim Ray, Air Force Global Strike Command commander. Individual B-1B aircraft will return to flight as inspections and maintenance directed during the stand-down are completed on each aircraft.

During the stand-down, maintenance depot personnel disassembled the Augmenter Fuel Filter Housing and performed a series of inspections. After each unit was determined to be free of defects, it was reassembled, pressure checked and returned to service.

“We are proud of the tremendous efforts of our maintainers and B-1 partners in identifying, inspecting, and remediating any potential issues with the B-1B fuel filter housing,” said Maj. Gen. Mark Weatherington, Eighth Air Force commander, who is responsible for the Air Force bomber force. “The aircraft are still safe to fly and we are confident that this stand-down has resulted in increased safety within the B-1B fleet.”

The entire maintenance, depot, engineering and acquisition team must be commended for getting the B-1B bombers back into the hands of warfighters in a very short time, according to AFGSC officials.

Although this was an Air Force enterprise-wide effort, special thanks must go to the maintainers at Ellsworth Air Force Base, S.D., Dyess AFB, Texas and the AFGSC staff, as well as Air Force Sustainment Center’s depot team, Air Force Life Cycle Management Center’s B-1 Program Office and Propulsion Directorate, the Air Staff and the Secretary of the Air Force office of Acquisitions, Technology and Logistics on their efforts.

The precautionary safety stand-down and holistic inspection of the Augmenter Fuel Filter Housing on each aircraft was ordered after an April 8 ground emergency resulted in the discovery of a discrepancy with the system.

FMI: www.af.mil

Advertisement

More News

Aero-News: Quote of the Day (10.13.24)

“Achieving this milestone and ensuring the timely delivery of the first six aircraft required extensive coordination and cooperation among industry partners, PMA-265 and the >[...]

Major Milestone For Hornet Extension Project

Significant Accomplishment For RCAF And PMA-265 Collaboration The Royal Canadian Air Force (RCAF) announced that the CF-18 Hornet Extension Project (HEP) has achieved initial Opera>[...]

PHI Adds Airbus Helicopters Into Service In Australia

Two H175s Will Support Multiple Roles PHI Aviation in Australia has placed two Airbus H175 helicopters into service and will be based out of the company’s Broome location in >[...]

Launch Event Held For New Full Flight Sim In Dubai

Ansett Aviation Opens New Airbus A320 ceo/neo Training Center Ansett Aviation Training held a launch celebration to showcase the opening of its brand new Airbus A320 ceo/neo full f>[...]

Pilot Rescued After Noseover in Inguadona Lake

Man Pulled From the Water and Treated for Minor Injuries On October 8, an Air Tractor AT-802A Fire Boss made a noseover landing while performing a routine proficiency flight over C>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC