First Drop: Lancer Drops JSOW In Tests At Edwards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.09.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne-Unlimited-12.06.24

Tue, Jul 08, 2003

First Drop: Lancer Drops JSOW In Tests At Edwards

A B-1B Lancer test crew at Edwards AFB recently dropped the Joint Standoff Weapon for the first time from the long-range bomber, according to the Air Force Flight Test Center.

The four-person global power bomber combined test force flight team from the 419th Flight Test Squadron released two standoff weapons as part of ongoing separation testing on the Lancer. The weapon is intended to provide a low-cost, highly lethal glide weapon with a standoff capability which allows aircrews to hit a target from a distance, reducing the risk from enemy defenses, officials said.

The JSOW family of air-to-surface glide weapons has a range of 12 nautical miles at low altitudes and as much as 63 nautical miles at high-altitudes, according to program office experts.

Ultimately, Tom said it is the operators in the field who will benefit from the new standoff weapons capability. It is slated to be used against a variety of land and sea targets and will operate from ranges outside enemy point defenses.

Test force experts are also evaluating the vibration and acoustic environment of the B-1B's bomb bays with the new weapons and with various weapons-bay door configurations, said Maj. Brian Tom, a weapon system officer on the mission. The team is also performing similar tests using the Joint Air-to-Surface Standoff Missile.

Testing on both weapons is also relying on the B-1B's new Block E1 avionics software for the first part of the test program, Tom said. The bomber team is evaluating the software as part of a separate, ongoing test program.

Previous testing on this new software allowed team members to successfully use it during the recent drop, he said. Tom serves as the project weapon system officer for both the E1 software test program and the integration tests. New integration software testing will begin in August, according to program officials.

"Maintenance is a huge part of our success," he said. "Our maintainers have kept us on track, and we haven't lost a single sortie since we started testing." [ANN Thanks Leigh Anne Bierstine, Air Force Flight Test Center Public Affairs]

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (12.07.24): Ultralight Vehicle

Ultralight Vehicle A single-occupant aeronautical vehicle operated for sport or recreational purposes which does not require FAA registration, an airworthiness certificate, or pilo>[...]

ANN's Daily Aero-Linx (12.07.24)

Aero Linx: 1-26 Association The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is found in One Design>[...]

Airborne 12.02.24: Electra FG EIS, Prez Osprey Problems, Starship Wants 25

Also: EAA Ray Foundation, MagniX Records, Ruko U11MINI Drone, RCAF PC-21s Elektra Solar recently put the first aircraft from its Elektra Trainer Fixed-Gear (FG) family into service>[...]

Aero-News: Quote of the Day (12.08.24)

“Airline workers know far too well the devastating effects corporate bankruptcies have on the lives of hardworking Americans. Following 9/11, pilots, including myself, made e>[...]

ANN's Daily Aero-Term (12.08.24): Approach Speed

Approach Speed The recommended speed contained in aircraft manuals used by pilots when making an approach to landing. This speed will vary for different segments of an approach as >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC