A350 XWB In Bolivia For High Altitude Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jan 10, 2014

A350 XWB In Bolivia For High Altitude Testing

MSN3 To Validate Full Functionality Of Engines And Systems At Extreme Altitudes

The A350 XWB development aircraft, MSN3, is in Bolivia where it will perform a series of tests at the high altitude airfields of Cochabamba and La Paz. Cochabamba is around 8,300 feet above sea level, and La Paz is one of the world’s highest airports at 13,300 feet.

Operations at such high altitude airfields are particularly demanding on aircraft engines, Auxiliary Power Unit (APU) and systems. The aim of these trials is to demonstrate and validate the full functionality of engines, systems, materials as well as to assess the overall aircraft behavior under these extreme conditions. A number of take-offs with all engines operating and with simulated engine failures are being performed at each of the airfields to collect data on engine operating characteristics and validate the aircraft take-off performance. The autopilot behavior will also be evaluated during automatic landings and go-arounds.

Since the A350 XWB’s first flight with MSN1 on June 14th 2013, over 800 flight test hours have been performed in close to 200 test flights by both MSN1 and MSN3. In total the A350 XWB flight test campaign will accumulate around 2,500 flight hours with the fleet of five aircraft. The rigorous flight testing will lead to the certification of the A350-900 by the European EASA and US FAA airworthiness authorities, prior to entry into service in Q4 2014.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Aero-News: Quote of the Day (12.18.25)

“These new aircraft strengthen our ability to respond quickly, train effectively and support communities nationwide. Textron Aviation has been a steadfast supporter in helpin>[...]

Classic Aero-TV: Viking Twin Otter 400--Bringing the DHC-6 Back Into Production

From 2011 (YouTube Edition): Rugged, Legendary, STOL Twin Makes A Comeback The de Havilland Twin Otter is an airplane with a long history, and it gained a reputation as a workhorse>[...]

NTSB Final Report: Rans Employee Flying Club Rans S-6ES Coyote II

A Wind Gust Lifted The Right Wing And The Airplane Turned To The Left Analysis: The pilot was departing from a 2,395-ft-long by 50-ft-wide turf runway. The pilot reported that afte>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (12.18.25): Braking Action Advisories

Braking Action Advisories When tower controllers receive runway braking action reports which include the terms “medium," “poor," or “nil," or whenever weather con>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC