Countdown Begins For Discovery Launch As Clouds Threaten Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jun 28, 2006

Countdown Begins For Discovery Launch As Clouds Threaten Delay

Launch May Be Delayed Several Days Due To Stormy Weather

As NASA starts the clock Wednesday towards Saturday's scheduled launch of the space shuttle Discovery, a less-than-ideal weather forecast may mean the orbiter will sit on the pad a little longer than planned.

NASA shuttle weather officer Kathy Winters told the Associated Press there is a 60 percent chance of storm clouds Saturday, which due to the potential for lightning would prevent liftoff unless the clouds were to part during the 10-minute launch window.

If Discovery's Saturday launch is postponed, it may mean the shuttle will sit on the pad for several days after that... as the weather is only expected to grow worse throughout next week.

NASA test director Jeff Spaulding says the space shuttle currently had no technical problems that would prevent a launch attempt, however... and hinted he is cautiously optimstic about the launch going forward.

"Obviously these forecasts, while they sound a little bit gloomy, we've certainly launched with higher predictions of no-go," Spaulding said.

Even if the launch is delayed for several days, NASA will have plenty of time to launch Discovery -- its launch window runs through July 19.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC